| 1 | 2007 | BP Atlantis Riser Pull-In System | Testing, Commissioning and Riser Installation | British Petroleum |
| 2 | 2008 | Armada Perkasa FPSO, Mooring System including Chain Stoppers, Fairleads and Deck Sheaves | Engineering Design, Procurement, Construction, Testing, Commissioning and Mooring Line Installation | Bumi Armada Berhad |
| 3 | 2009 | Armada Perdana FPSO, Mooring System including Chain Stoppers, Fairleads, Deck Sheaves and Pull-in Winch | Engineering Design, Procurement, Construction, Testing, Commissioning and Mooring Line Installation | Bumi Armada Berhad |
| 4 | 2009 | Aramada Perdana FPSO Riser Pull-In System | Engineering Design, Procurement, Construction, Testing, Commissioning and Riser Installation | Bumi Armada Berhad |
| 5 | 2009 | Armada Tua 104 150T A-Frame | Engineering Design, Procurement, Construction, Testing, Installation, and Commissioning | Bumi Armada Berhad |
| 6 | 2010 | Lewek Falcon 350T A-Frame | Engineering Design, Procurement, Construction, Testing, Installation and Commissioning | EMAS |
| 7 | 2010 | Shell Gumusut Kakap 100T Reel Transfer System and HPU for Sapura 3000 | Engineering Design, Procurement, Construction and Testing | Sapura Acergy |
| 8 | 2010 | Shell Gumusut Kakap Hang-Off Platform for Sapura 3000 | Engineering Design, Procurement, Construction and Testing | Sapura Acergy |
| 9 | 2010 | Shell Gumusut Kakap Hydraulic Wire Pusher for Sapura 3000 | Engineering Design | Sapura Acergy |
| 10 | 2011 | 120T Spooling Machine with Diesel HPU (Kimspool 8) | Engineering Design, Procurement, Construction, Testing and Commissioning | KTL Offshore |
| 11 | 2011 | Shell Gumusut Kakap Rack & Pinion Hang-off Platform for Sapura 3000 | Engineering Design, Procurement, Construction and Testing | Sapura Acergy |
| 12 | 2011 | Shell Gumusut Kakap A&R Roller for Sapura 3000- J-Lay System | Engineering Design, Procurement, Construction and Testing | Sapura Acergy |
| 13 | 2011 | Shell Gumusut Kakap Personnel Gangway for Sapura 3000 | Engineering Design | Sapura Acergy |
| 14 | 2011 | 30T Pipe Lay Tensioner, A&R Winch and HPU | Engineering Design, Procurement, Construction and Testing | PT Onasis |
| 15 | 2011 | Motion Compensated Workover Tower | Engineering Design, Procurement, Construction and Testing | Murphy Oil |
| 16 | 2012 | Shell Gumusut Kakap Pig Launcher | Procurement, Construction and Testing | Sapura Acergy |
| 17 | 2012 | Shell Gumusut Kakap Load Handling Equipment for J-Lay Pipe Coating Station for Sapura 3000 | Engineering Design, Procurement, Construction and Testing | Sapura Acergy |
| 19 | 2012 | Gumusut Kakap Riser Pull-In Heads | Engineering Analysis | Sapura Acergy |
| 20 | 2012 | FPSO Cendor Mooring System including Chain Stoppers, Fairleads and deck sheaves | Engineering Design, Procurement, Construction and Testing | MISC |
| 21 | 2012 | 100T Crane Modification | Engineering Design, Procurement, Construction and Testing | Allied Marine & Equipment |
| 22 | 2012 | 2T Man-Riding Crane | Engineering Design, Procurement, Construction and Testing | ASL Shipyard |
| 23 | 2012 | Shell Gumusut Kakap Riser Pull Head Load Test Flanges | Engineering Design, Procurement, Construction and Testing | Sapura Acergy |
| 18 | 2013 | 5T Constant Tension Winch | Engineering Design, Procurement, Construction and Testing | CAZ |
| 24 | 2013 | Surface Mooring Connection Tool | Engineering Design, Procurement, Construction and Testing | Technip |
| 25 | 2013 | 30T Riser Pull-In Winch and Turndown Sheave | Engineering Design, Procurement, Construction and Testing | MISC |
| 26 | 2013 | Personnel Gangway | Refurbishment | EMAS |
| 27 | 2013 | Rio Tinto Train Car Positioner and HPU | Engineering Design, Procurement, Construction and Testing | ARK |
| 28 | 2013 | Gumusut Kakap Overboarding Roller for Sapura 3000 A&R Winch | Engineering Design, Procurement, Construction and Testing | Sapura Acergy |
| 29 | 2013 | Streamer Winch and HPU, 2 sets | Engineering Design, Procurement, Construction and Testing | Piasau Slipways |
| 30 | 2013 | PDVSA Chain Stoppers and Fairleads with Load Monitoring | Engineering Design, Procurement, Construction and Testing | Technip |
| 31 | 2013 | Gumusut Kakap Riser Pull-In Contingency Analysis | Engineering Analysis | Sapura Acergy |
| 32 | 2014 | Constant Tension Hose Winch and HPU | Engineering Design, Procurement, Construction and Testing | Armada Rig Builders |
| 33 | 2014 | Gorgon Subsea Equipment Seafastening | Engineering Design | Subsea 7 |
| 34 | 2014 | Cluster 7 FPSO Deck Sheaves for Mooring Pull-In | Engineering Design, Procurement, Construction and Testing | Bumi Armada Berhad |
| 35 | 2014 | Hawser Winch and HPU, 2 sets | Engineering Design, Procurement, Construction and Testing | Lundin |
| 36 | 2014 | Armada JPC Launch and Recovery System | Engineering Design, Procurement, Construction and Testing | Armada Rig Builders |
| 37 | 2015 | 40T Box Boom Crane | Engineering Design | Hoang Long Joint Operating Company |
| 38 | 2015 | 150T Lattice Boom Crane | Engineering Design | Koastal Industries Pte Ltd |
| 39 | 2015 | Shell Malakai Riser Pull-In System | Refurbishment, Testing and Re-certification | Technip |
| 40 | 2015 | JSPL Mooring Winch and Underwater Fairlead | Engineering Design | Jurong Shipyard Pte Ltd |
| 41 | 2015 | TYM Anchor Handling Winch and Fairlead | Engineering Design | Vietsovpetro |
| 42 | 2015 | Thunder Horse Mooring Chain Jacks Replacement | Engineering Design | British Petroleum |
| 43 | 2015 | Rig Skidding System | Engineering Design, Procurement, Construction and Testing | EMS |
| 44 | 2015 | Badamyar Pipeline Installation Aids | Fabrication | Sapura Acergy |
| 45 | 2015 | Badamyar Installation Aids Seafastening | Engineering Design | Sapura Acergy |
| 46 | 2015 | Badamyar Overboarding Chute | Engineering Design, Procurement, Construction and Testing | Sapura Acergy |
| 47 | 2016 | 2700HP Diesel HPU | Engineering and Testing | Versabar |
| 48 | 2016 | Seawater Distribution Manifold with Flow Measurement | Engineering | Versabar |
| 49 | 2016 | Vessel Lifting System, Screw Jacks and HPU | Engineering and Testing | Versabar |
| 50 | 2017 | Rig Skidding System and Sea-fixing Clamps | Engineering | Versabar |
| 51 | 2017 | BOP Testing Stand | Engineering | C Automation |
| 52 | 2017 | 100T Active Heave Comp Winch System | Engineering, Testing, Installation and Commissioning | Versabar |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |